Türkiye is a clean energy powerhouse in the making and batteries are the next frontier in the MENA clean energy markets.

Dii Desert Energy, a leading energy transition think tank and industry platform for the MENA region since 2009, has unveiled two new studies ahead of their official launch at the 16th Dii Desert Energy Leadership Summit on 29 September to 1 October in Istanbul, Türkiye.

As a timely contribution just ahead of COP31, the study ‘Türkiye 2035: A Strategic Roadmap to a 120+ GW Solar and Wind Future’, evaluates Türkiye’s current energy mix and low emission project forecasts, highlighting the nation’s transition into a regional clean energy production, storage and transmission hub. This shift envisions a future where Türkiye evolves from a net (fossil) energy importer into a pivotal clean energy exporter, leveraging its vast renewable potential to power the European market. The study is peer-reviewed by international experts and key Turkish stakeholders.

Petra Schwager, Chief, Climate and Technology Partnerships Division, UNIDO: “UNIDO’s Global Programme for Hydrogen in Industry welcomes this roadmap by Dii Desert Energy as in a timely contribution to the clean energy transition. By highlighting the synergies between large-scale renewable energy deployment and green hydrogen development, the report underscores Türkiye’s potential to drive industrial decarbonization and regional energy cooperation. As momentum builds toward COP31, this publication offers valuable insights for policymakers, industry leaders, and investors seeking practical pathways to accelerate climate action, competitiveness, and sustainable industrial development.”

The ‘Türkiye 2035: A Strategic Roadmap to a 120+ GW Solar and Wind Future’ study will be officially launched at the Summit on 30th September by Chiara Aruffo, PhD, Director of Research and Cornelius Matthes, CEO, Dii Desert Energy.

‘The Battery Boom: Scaling Giga-Scale Storage Across MENA’, in partnership with HiTHIUM Energy Storage, provides in depth views on the MENA utility-scale battery energy storage systems (BESS) market in 2026: its size and outlook to 2030 and beyond, its business models and characteristics, and hands-on case studies, drawing on the Dii MENA BESS projects database, which currently tracks 113 BESS projects across 14 countries.

Cornelius Matthes, CEO, Dii Desert Energy: “With its leadership as a global top 10 in hydropower and geothermal, Türkiye surely has the potential to become a superproducer also for solar PV and wind, leveraging on its geostrategic position. We expect COP 31 in Antalya to accelerate this development.”

“After the initial BESS report in 2019, Dii’s new report shows how the MENA region is again leading a revolution in prices and scale deployed in record time. BESS indeed makes low emission around the clock energy competitive, even in a distorted market without a price for CO2 and remaining fossil fuel subsidies.”

The ‘The Battery Boom: Scaling Giga-Scale Storage Across MENA’ study will be officially launched at the Summit on 1 October by Ben Li, MEA President, HiTHIUM Energy Storage; Sivaguru Paramasivam, Director of Application Engineering, HiTHIUM Energy Storage; and Chiara Aruffo, PhD, Director of Research, Dii Desert Energy.

Key highlights from Türkiye 2035 include:

  • Türkiye should be deploying 8 GW of solar and wind per year through 2035 to meet the 120 GW target from its 40.6 GW end-2025 baseline, a rate that is ambitious but consistent with recent deployment momentum.
  • Grid capacity is by far the most critical constraint: 65% of unlicensed applications were rejected in 2024–2025 due to regional limits. The $30 billion TEİAŞ upgrade and €625 million World Bank loan provide a credible but time-sensitive response.
  • At 1.99 EUR-cent/kWh, the Saudi Arabia bilateral agreement has set the lowest renewable energy tariff ever recorded in Türkiye, signalling the competitive pressure that government-to-government frameworks can unlock.
  • A 170 GW high-growth scenario for wind and solar seems realistic if bilateral partnerships double, the storage-integrated projects pipeline will effectively be implemented, hybrid potential is maximized, and the unlicensed sector sustains recent growth trends.
  • Türkiye holds the largest battery storage development pipeline in EU-MENA at 32.9 GW, yet only 1.5 GW has progressed to full generation license, creating a significant acquisition opportunity for well-capitalised sponsors.
  • Türkiye’s hydrogen roadmap targets 5 GW of electrolyzer capacity by 2035 at under $2.40/kg, positioning the country as a future clean energy molecule exporter alongside its growing role as a clean electricity transit hub for Europe.

Key highlights from The Battery Boom include:

  • MENA’s installed BESS capacity grew 16-fold in a single year, from 808 MWh in 2024 to 12,765 MWh by end-2025, and is on track to reach 149,358 MWh by 2030, a 64% compound annual growth rate from the end-2025 base. The future pipeline now stands at 84 projects totaling 128,573 MWh, more than five times today’s operational capacity.
  • Regulatory maturity separates the markets scaling storage today from those still waiting. Saudi Arabia’s Independent Storage Provider framework, with its mandated four-hour duration and 15-year Storage Services Agreements, has made it the region’s most bankable market.
  • Markets without dedicated storage legislation, such as Egypt and Kuwait, are still closing deals, but through individually negotiated Purchase Agreements rather than standardized tenders, with bankability resting on counterparty structuring rather than regulatory certainty.
  • Gigafactory-scale manufacturing investment, including YEO/Great Power in Türkiye and Sungrow and Cornex in Egypt, is turning MENA from a pure demand market into an emerging manufacturing and export base. This mirrors the solar PV pattern a decade earlier: once deployment volumes justify it, local manufacturing follows.
  • Across every case study one theme recurs: the core battery technology is mature, even as grid integration, degradation, safety and performance guarantees remain project-specific. What now binds is execution: financing structures, supply-chain resilience, ramp-up timing and evolving grid codes.

Find out more

The studies are available to download at https://dii-desertenergy.org/publications/ 

More information on the Dii Desert Energy Leadership Summit can be found at https://www.diisummit.org/

Share the Post: